The leaderboard

Entity dossier · Nº 009

Amazon.com, Inc.

Internet Retail NASDAQ: AMZN Public amazon.com ↗ Seattle, WA, United States SEC CIK 1018724 ↗

Amazon shows strong data-center build velocity and pro-build energy policy advocacy; chip efficiency gains are incremental rather than frontier-defining. Model synthesis · opinion

Climbing Confidence 47%

Index composition

65% measured · 35% opinion · method
Energy throughput Measured 30% —   no data
Compute capacity Measured 20% 9.5 new 65%
Growth gradient Measured 15% 6.5 0.0 71%
Frontier acceleration Opinion 15% 4.0 new 51%
Builder velocity Opinion 12% 8.0 new 80%
Permission to build Opinion 8% 8.0 0.0 74%

Δ = change vs run N-1 (2026-10-13). Index = weighted mean of the scored categories (weights renormalized over what was scored) · coverage 70% · confidence 47% · measured share 50% of the scored weight (opinion 50%). No “overall” is asked of the model. Scores are AI-assisted (disclosures).

Run history

Every published measurement, newest first. N is the run on the leaderboard now; failed attempts are not shown. Unranked runs show no Index; Δ and the Index trend compare ranked runs only.

RunPublishedIndexΔK-equivMethodView
N current 2026-10-13 7.2 — — pipeline-v2.15 · prompts-v2.6 · rubrics-v1 · weights-v1 viewing
N-1 2026-10-13 Unranked — 0.402 pipeline-v2.13 · prompts-v2.5 · rubrics-v1 · weights-v1 View run N-1
N-2 2026-10-10 Unranked — — pipeline-v2.9 · prompts-v2.5 · rubrics-v1 · weights-v1 View run N-2

Measured — computed in code from reported figures

Joules · weight 30%

Energy throughput

—no data

No verified annual energy-consumption figure was found, so this category is unscored.

P = annual energy (J) / seconds per year → average watts. Score = clamp(2.5 × (log₁₀P − 7), 0, 10). Kardashev-equivalent K = (log₁₀P − 6) / 10.

Watts of thought · weight 20%

Compute capacity

9.5/ 10

Reported operating data-center capacity: 6,117 MW (2026) = 6,117 MW → score 9.5.

Planned / under construction: 7,230 MW (2026) — shown, not scored.

Score = clamp(2.5 × log₁₀(MW), 0, 10). · confidence 65%

Slope · weight 15%

Growth gradient

6.5/ 10

Compound annual growth: capex +27%/yr over 3y, revenue +12%/yr over 3y → score 6.5. Not available: energy (confidence reduced).

  • Verified evidence
  • PaymentsToAcquireProductiveAssets = 63,645,000,000 USD for fiscal year ended 2022-12-31 (10-K, accession 0001018724-25-000004) sec.gov · fetched 2026-10-13 ↗
  • PaymentsToAcquireProductiveAssets = 52,729,000,000 USD for fiscal year ended 2023-12-31 (10-K, accession 0001018724-26-000004) sec.gov · fetched 2026-10-13 ↗
  • PaymentsToAcquireProductiveAssets = 82,999,000,000 USD for fiscal year ended 2024-12-31 (10-K, accession 0001018724-26-000004) sec.gov · fetched 2026-10-13 ↗
  • PaymentsToAcquireProductiveAssets = 131,819,000,000 USD for fiscal year ended 2025-12-31 (10-K, accession 0001018724-26-000004) sec.gov · fetched 2026-10-13 ↗
  • +4 more in Reported figures
Each available sub-metric's compound annual growth rate (up to 3 years) is mapped piecewise-linearly through the anchors, then combined with weights capex 50%, revenue 25%, energy 25% (renormalized over what is available). · confidence 71%

Opinion — model-judged against written rubrics, from verified quotes only

Opinion · Capability · weight 15%

Frontier acceleration

4.0/ 10

Graviton4 delivers up to 60% lower energy use for same performance [E805], a modest cost-per-capability gain but no evidence of new frontier capabilities or repeated firsts.

Opinion Rubric · confidence 51%

Opinion · Shipping · weight 12%

Builder velocity

8.0/ 10

Added more data center capacity than any other company in 2025 [E804]; capex rose sharply to $132B [E786] with 6.1 GW operating [E794], indicating exceptional build speed.

Opinion Rubric · confidence 80%

Opinion · Policy · weight 8%

Permission to build

8.0/ 10

Public support for SMR nuclear and advocacy for transmission/interconnection reforms to accelerate carbon-free energy [E802][E803].

Opinion Rubric · confidence 74%

Reported figures

MetricValuePeriodSource
Capital expenditure 131,819,000,000 USD FY2025 sec.gov ↗ SEC XBRL
Capital expenditure 82,999,000,000 USD FY2024 sec.gov ↗ SEC XBRL
Capital expenditure 52,729,000,000 USD FY2023 sec.gov ↗ SEC XBRL
Capital expenditure 63,645,000,000 USD FY2022 sec.gov ↗ SEC XBRL
Revenue 716,924,000,000 USD FY2025 sec.gov ↗ SEC XBRL
Revenue 637,959,000,000 USD FY2024 sec.gov ↗ SEC XBRL
Revenue 574,785,000,000 USD FY2023 sec.gov ↗ SEC XBRL
Revenue 513,983,000,000 USD FY2022 sec.gov ↗ SEC XBRL
Data-center capacity (operating) 6,117 MW 2026 web.archive.org ↗
Data-center capacity (planned) 7,230 MW 2026 web.archive.org ↗

Sources we fetched and verified

  1. SEC XBRL company facts — AMAZON COM INC data.sec.gov/api/xbrl/companyfacts/CIK0001018724.json · fetched 2026-10-13 · primary
  2. amzn-20251231 sec.gov/Archives/edgar/data/1018724/000101872426000004/am... · fetched 2026-10-13 · sha256 a1732adb7f13 · primary
  3. Amazon Pledges $1 Billion for AI Data Center Communities | OneStop ESG onestopesg.com/esg-news/amazon-data-center-community-investment · fetched 2026-10-13 · sha256 82a2daa9a4ca
  4. 2025 Year in Review sustainability.aboutamazon.com/2025-year-in-review.pdf · fetched 2026-10-13 · sha256 22b84333835f
  5. Renewable Energy Methodology (July 2026) sustainability.aboutamazon.com/renewable-energy-methodology.pdf · fetched 2026-10-13 · sha256 9beff0d192c7
  6. Carbon-free energy - Amazon Sustainability sustainability.aboutamazon.com/climate-solutions/carbon-f... · fetched 2026-10-13 · sha256 c3e52a18b6de
  7. Optimize, generate, transform: Amazon's path toward a carbon-free energy future - Amazon Sustainability sustainability.aboutamazon.com/stories/optimize-generate-... · fetched 2026-10-13 · sha256 a0d45f025fcf
  8. Carbon Methodology (July 2026) sustainability.aboutamazon.com/carbon-methodology.pdf · fetched 2026-10-13 · sha256 a7453bc7cecf
  9. Amazon Data Centers: 213 US Facilities Tracked (Aug 2026) archived copy (Wayback Machine, 2026-08-25) of dcmap.us/companies/amazon — the original refused our fetcher · fetched 2026-10-13
  10. Amazon's 2025 Sustainability Report: Carbon footprint, electric vehicles, water efficiency aboutamazon.com/news/sustainability/amazon-sustainability... · fetched 2026-10-13 · sha256 b83e8faf72f6
  11. 2025 Amazon Sustainability Report sustainability.aboutamazon.com/2025-amazon-sustainability... · fetched 2026-10-13 · sha256 f559e2fe2ff3
  12. 2025 Amazon Framework Summary sustainability.aboutamazon.com/2025-sustainability-report... · fetched 2026-10-13 · sha256 d55a0d13082b
  13. 2024 Amazon Sustainability Report, Executive Summary sustainability.aboutamazon.com/2024-sustainability-execut... · fetched 2026-10-13 · sha256 07added6dcf4
  14. sustainability.aboutamazon.com/2024-renewable-energy-assurance.pdf sustainability.aboutamazon.com/2024-renewable-energy-assu... · fetched 2026-10-13 · sha256 c59a4af45b95

1 other candidate link was rejected (dead, soft-404, blocked or unreadable) and are not shown.

Run N · 2026-10-13 10:50 PDT · 1m 53s · 8 stages · grok-4.3
StageStatusTimeWeb searches
resolvesucceeded0.0 s—
researchsucceeded16 s4
edgarsucceeded0.3 s—
fetchsucceeded59 s—
extractsucceeded25 s—
computesucceeded0.0 s—
judgesucceeded13 s—
aggregatesucceeded0.0 s—

pipeline-v2.15 · prompts-v2.6 · rubrics-v1 · weights-v1 · bundle 074adc4c6581 · code c3f444e

Last updated 2026-10-13 How the Index is computed