Joules · weight 30%
Energy throughput
Reported energy consumed: 596,000 GJ (2025) = 166 GWh/yr → 18.9 MW average → score 0.7, K = 0.128.
- Verified evidence
e. Total energy consumption: 596,000 GJ
cdn.prod.website-files.com · fetched 2026-10-09 ↗
Entity dossier · Nº 007
Crusoe shows operating data-center capacity and novel energy microgrids but lacks policy evidence or speed metrics. Model synthesis · opinion
18.9 MW average power · 166 GWh/yr energy consumed (2025).
K = (log₁₀P − 6) / 10 with P in watts. Humanity today ≈ K 0.73. Computed in code from the reported figure — source: cdn.prod.website-files.com/6855c1aa175582ee23e0aa19/6aa97....
Index composition
65% measured · 35% opinion · methodΔ = change vs run N-1 (2026-10-09). Index = weighted mean of the scored categories (weights renormalized over what was scored) · coverage 77% · confidence 46% · measured share 65% of the scored weight (opinion 35%). No “overall” is asked of the model. Scores are AI-assisted (disclosures).
Every published measurement, newest first. N is the run on the leaderboard now; failed attempts are not shown. Unranked runs show no Index; Δ and the Index trend compare ranked runs only.
| Run | Published | Index | Δ | K-equiv | Method | View |
|---|---|---|---|---|---|---|
| N current | 2026-10-09 | 3.6 | -0.9 | 0.128 | pipeline-v2.6 · weights-v1 · rubrics-v1 | viewing |
| N-1 | 2026-10-09 | Unranked | — | 0.258 | pipeline-v2.4 · weights-v1 · rubrics-v1 | View run N-1 |
| N-2 | 2026-10-09 | 4.5 | — | 0.128 | pipeline-v2.2 · weights-v1 · rubrics-v1 | View run N-2 |
Joules · weight 30%
Reported energy consumed: 596,000 GJ (2025) = 166 GWh/yr → 18.9 MW average → score 0.7, K = 0.128.
e. Total energy consumption: 596,000 GJcdn.prod.website-files.com · fetched 2026-10-09 ↗
Watts of thought · weight 20%
Reported operating data-center capacity: 206 MW (2025) = 206 MW → score 5.8.
Planned / under construction: 4,900 MW (2026) — shown, not scored.
total campus capacity 1.2 GW commissioned and in operation 206 MWcdn.prod.website-files.com · fetched 2026-10-09 ↗
Slope · weight 15%
Fewer than two comparable annual figures were found, so growth is unscored.
Opinion · Capability · weight 15%
First-of-its-kind second-life EV battery microgrid paired with iron-air storage [E210] demonstrates near-state-of-the-art energy capability for data centers.
12 GWh of iron-air long-duration battery storage with Form Energy A first-of-its-kind second-life EV battery microgrid with Redwood Materials: 12 MW of solar paired with 63 MWhcrusoe.ai · fetched 2026-10-09 ↗
Opinion · Shipping · weight 12%
206 MW operating capacity [E201] and broke ground on 900 MW campus [E209] indicate ordinary industry cadence with no speed benchmarks.
total campus capacity 1.2 GW commissioned and in operation 206 MWcdn.prod.website-files.com · fetched 2026-10-09 ↗
Broke ground on a 900 MW campus in Claude, TXcdn.prod.website-files.com · fetched 2026-10-09 ↗
Opinion · Policy · weight 8%
No public positions or actions on permitting, energy or open technology in evidence.
| Metric | Value | Period | Source |
|---|---|---|---|
| Energy consumed | 596,000 GJ | 2025 | cdn.prod.website-files.com ↗ |
| Electricity consumed | 116,100 MWh | 2025 | cdn.prod.website-files.com ↗ |
| Data-center capacity (operating) | 206 MW | 2025 | cdn.prod.website-files.com ↗ |
| Energy storage deployed (not scored) | 12 GWh | 2027 | onestopesg.com ↗ |
| Energy storage deployed (not scored) | 63 MWh | 2026 | onestopesg.com ↗ |
| Data-center capacity (planned) | 4,900 MW | 2026 | savrn.com ↗ |
| Data-center capacity (planned) | 200 MW | 2026 | servercountry.org ↗ |
| Stage | Status | Time | Web searches |
|---|---|---|---|
| resolve | succeeded | 0.6 s | — |
| research | succeeded | 29 s | 5 |
| edgar | skipped | 0.0 s | — |
| fetch | succeeded | 19 s | — |
| extract | succeeded | 20 s | — |
| compute | succeeded | 0.0 s | — |
| judge | succeeded | 9.8 s | — |
| aggregate | succeeded | 0.0 s | — |
pipeline-v2.6 · prompts-v2.4 · rubrics-v1 · weights-v1 · bundle 51eec73010a9 · code e14a082