Joules · weight 30%
Energy throughput
No verified annual energy-consumption figure was found, so this category is unscored.
Entity dossier · Nº 006
Anthropic shows clear pro-build energy advocacy but no supporting data on frontier tech releases or actual build speed. Model synthesis · opinion
Index composition
65% measured · 35% opinion · methodΔ = change vs run N-1 (2026-11-10). Index = weighted mean of the scored categories (weights renormalized over what was scored) · coverage 43% · confidence 18% · measured share 81% of the scored weight (opinion 19%). No “overall” is asked of the model. Scores are AI-assisted (disclosures).
Every published measurement, newest first. N is the run on the leaderboard now; failed attempts are not shown. Unranked runs show no Index; Δ and the Index trend compare ranked runs only.
| Run | Published | Index | Δ | K-equiv | Method | View |
|---|---|---|---|---|---|---|
| N current | 2026-11-18 | Unranked | — | — | pipeline-v2.16 · prompts-v2.6 · rubrics-v1 · weights-v1 | viewing |
| N-1 | 2026-11-10 | Unranked | — | — | pipeline-v2.16 · prompts-v2.6 · rubrics-v1 · weights-v1 | View run N-1 |
| N-2 | 2026-11-02 | Unranked | — | — | pipeline-v2.16 · prompts-v2.6 · rubrics-v1 · weights-v1 | View run N-2 |
| N-3 | 2026-10-25 | Unranked | — | — | pipeline-v2.16 · prompts-v2.6 · rubrics-v1 · weights-v1 | View run N-3 |
| N-4 | 2026-10-17 | Unranked | — | — | pipeline-v2.16 · prompts-v2.6 · rubrics-v1 · weights-v1 | View run N-4 |
| N-5 | 2026-10-09 | Unranked | — | — | pipeline-v2.3 · prompts-v2.2 · rubrics-v1 · weights-v1 | View run N-5 |
| N-6 | 2026-10-09 | Unranked | — | — | pipeline-v2.2 · prompts-v2.2 · rubrics-v1 · weights-v1 | View run N-6 |
A later run (2026-11-26) completed but found too little verified data — insufficient data: energy undisclosed and 57% of the remaining weight scored (needs 60%, including compute or growth) — so it was not published. Run N stays current.
Joules · weight 30%
No verified annual energy-consumption figure was found, so this category is unscored.
Watts of thought · weight 20%
Reported operating data-center capacity: 1,037 MW (2026) = 1,037 MW → score 7.5.
Planned / under construction: 5,000 MW (2028) — shown, not scored.
Anthropic-Amazon New Carlisle is the largest tracked AI data center at about 1,037 MW of current IT powerepoch.ai · fetched 2026-11-18 ↗
Slope · weight 15%
Compound annual growth: revenue +254%/yr over 1y → score 10.0. Not available: capex, energy (confidence reduced).
full-year 2025 revenue of $4.6bn9fin.com · fetched 2026-11-18 ↗
Revenue reached $16.3bn in the first half of 20269fin.com · fetched 2026-11-18 ↗
Opinion · Capability · weight 15%
No evidence on capabilities shipped, cost reductions or open releases.
Opinion · Shipping · weight 12%
All capacity figures are planned; no shipped deployments or build cadence shown.
Opinion · Policy · weight 8%
Commits to funding grid upgrades and electricity costs [E1213][E1211]; calls for accelerated permitting on geothermal, gas and nuclear [E1212].
This year, we announced a plan to cover the costs of electricity price increases from our data centersanthropic.com · fetched 2026-11-18 ↗
Our Build AI in America report lays out the case for accelerating permitting on geothermal energy, natural gas, and nuclear projectsanthropic.com · fetched 2026-11-18 ↗
Cover grid infrastructure costs . We will pay for 100% of the grid upgrades needed to interconnect our data centersanthropic.com · fetched 2026-11-18 ↗
| Metric | Value | Period | Source |
|---|---|---|---|
| Data-center capacity (planned) | 2 GW | future | cryptobriefing.com ↗ |
| Data-center capacity (planned) | 460 MW | future | cryptobriefing.com ↗ |
| Data-center capacity (planned) | 1.7 GW | future | web.archive.org ↗ |
| Data-center capacity (planned) | 3.5 GW | 2026 | web.archive.org ↗ |
| Data-center capacity (planned) | 2 GW | 2027 | anthropic.com ↗ |
| Data-center capacity (planned) | 5 GW | 2028 | anthropic.com ↗ |
| Data-center capacity (operating) | 1.4 GW | 2025 | measuredai.substack.com ↗ |
| Data-center capacity (planned) | 15 GW | 2028 | measuredai.substack.com ↗ |
| Revenue | 16.3 USD billions | H1 2026 | 9fin.com ↗ |
| Revenue | 4.6 USD billions | 2025 | 9fin.com ↗ |
| Data-center capacity (operating) | 1,037 MW | 2026 | epoch.ai ↗ |
| Stage | Status | Time | Web searches |
|---|---|---|---|
| resolve | succeeded | 0.2 s | — |
| research | succeeded | 21 s | 4 |
| edgar | succeeded | 0.3 s | — |
| fetch | succeeded | 12 s | — |
| extract | succeeded | 17 s | — |
| compute | succeeded | 0.0 s | — |
| judge | succeeded | 11 s | — |
| aggregate | succeeded | 0.0 s | — |
pipeline-v2.16 · prompts-v2.6 · rubrics-v1 · weights-v1 · bundle 4f598a1f625a · code d86a50c