Entity dossier · Nº 006

Anthropic PBC

Artificial intelligence Private anthropic.com ↗ San Francisco, California, United States

Strong policy advocacy and large compute pipeline; no direct frontier capability evidence. Model synthesis · opinion

Unranked · insufficient data
Not ranked: insufficient data: energy undisclosed and 57% of the remaining weight scored (needs 60%, including compute or growth). We publish what was verified, but an entity is ranked only with at least 60% of the weight scored, more than 40% of the scored weight measured, and confidence above 20%. Ranking rules. Missing data is never filled with a default.

Index composition

65% measured · 35% opinion · method
Energy throughput Measured 30% —   no data
Compute capacity Measured 20% 7.9 new 65%
Growth gradient Measured 15% —   no data
Frontier acceleration Opinion 15% —   no data
Builder velocity Opinion 12% 6.0 new 70%
Permission to build Opinion 8% 8.0 0.0 69%

Δ = change vs run N-1 (2026-10-09). Index = weighted mean of the scored categories (weights renormalized over what was scored) · coverage 40% · confidence 27% · measured share 50% of the scored weight (opinion 50%). No “overall” is asked of the model. Scores are AI-assisted (disclosures).

Run history

Every published measurement, newest first. N is the run on the leaderboard now; failed attempts are not shown. Unranked runs show no Index; Δ and the Index trend compare ranked runs only.

RunPublishedIndexΔK-equivMethodView
N current 2026-10-09 Unranked — — pipeline-v2.3 · weights-v1 · rubrics-v1 viewing
N-1 2026-10-09 Unranked — — pipeline-v2.2 · weights-v1 · rubrics-v1 View run N-1

Measured — computed in code from reported figures

Joules · weight 30%

Energy throughput

—no data

No verified annual energy-consumption figure was found, so this category is unscored.

P = annual energy (J) / seconds per year → average watts. Score = clamp(2.5 × (log₁₀P − 7), 0, 10). Kardashev-equivalent K = (log₁₀P − 6) / 10.

Watts of thought · weight 20%

Compute capacity

7.9/ 10

Reported operating data-center capacity: 1.4 GW (2025) = 1,400 MW → score 7.9.

Planned / under construction: 15,000 MW (2028) — shown, not scored.

Score = clamp(2.5 × log₁₀(MW), 0, 10). · confidence 65%

Slope · weight 15%

Growth gradient

—no data

Fewer than two comparable annual figures were found, so growth is unscored.

Each available sub-metric's compound annual growth rate (up to 3 years) is mapped piecewise-linearly through the anchors, then combined with weights capex 50%, revenue 25%, energy 25% (renormalized over what is available).

Opinion — model-judged against written rubrics, from verified quotes only

Opinion · Capability · weight 15%

Frontier acceleration

—insufficient

No evidence on new capabilities, first-to-ship tech, or cost reductions; only infrastructure and revenue figures.

Opinion Rubric

Opinion · Shipping · weight 12%

Builder velocity

6.0/ 10

Multiple large power agreements and 1.4 GW operating capacity with near-term additions; plans for multi-GW scale but limited proof of record speed.

Opinion Rubric · confidence 70%

Opinion · Policy · weight 8%

Permission to build

8.0/ 10

Explicit calls to accelerate permitting, transmission, and executive action for energy build-out without added restrictions.

Opinion Rubric · confidence 69%

Reported figures

MetricValuePeriodSource
Data-center capacity (planned) 300 MW 2026 anthropic.com ↗
Data-center capacity (planned) 5 GW 2026 anthropic.com ↗
Data-center capacity (planned) 5 GW 2027 anthropic.com ↗
Data-center capacity (planned) 15 GW 2028 measuredai.substack.com ↗
Data-center capacity (operating) 1.4 GW 2025 measuredai.substack.com ↗
Revenue 4.6 USD billions 2025 thenextweb.com ↗

Sources we fetched and verified

  1. Building AI in America v3 www-cdn.anthropic.com/13e4cfd61ee168c0372256d7de83d57c9df... · fetched 2026-10-09 · sha256 60f1fe28ed26 · primary
  2. Build AI in America: Anthropic Energy Report \ Anthropic anthropic.com/news/build-ai-in-america · fetched 2026-10-09 · sha256 36da932ee798 · primary
  3. Covering electricity price increases \ Anthropic anthropic.com/news/covering-electricity-price-increases · fetched 2026-10-09 · sha256 9927c7c84ca3 · primary
  4. Higher usage limits and a SpaceX compute deal \ Anthropic anthropic.com/news/higher-limits-spacex · fetched 2026-10-09 · sha256 6cb57296c8ef · primary
  5. Introducing the Anthropic Cyber Mission \ Anthropic anthropic.com/news/anthropic-cyber-mission · fetched 2026-10-09 · sha256 50e6a34f3e40 · primary
  6. Economic Index: AI's role in the US and global economy \ Anthropic anthropic.com/research/economic-index-geography · fetched 2026-10-09 · sha256 f09184b8cd08 · primary
  7. Anthropic’s 15+ GW Data Center Build: Claude’s Compute, Campuses, and Chips measuredai.substack.com/p/anthropic-data-centers · fetched 2026-10-09 · sha256 6dd7c512fb9f
  8. Energy & Sustainability Tracker: Webscale & AI Compute, 2025 – MTN Consulting mtn-c.com/product/energy-sustainability-tracker-webscale-... · fetched 2026-10-09 · sha256 f17a704cc3a0
  9. Anthropic lost $42bn in 2025 as revenue grew 12-fold, Reuters reports thenextweb.com/news/anthropic-ipo-prospectus-42bn-loss-51... · fetched 2026-10-09 · sha256 b90a97329a85
  10. Anthropic Took Microsoft's Spot at Nscale's West Virginia Campus. The Price: $45B vktr.com/ai-market/anthropic-signs-45-billion-compute-dea... · fetched 2026-10-09 · sha256 bb79427966e5

2 other candidate links were rejected (dead, soft-404, blocked or unreadable) and are not shown.

Run N · 2026-10-09 10:37 PDT · 1m 11s · 8 stages · grok-4.3
StageStatusTimeWeb searches
resolvesucceeded0.5 s—
researchsucceeded25 s5
edgarskipped0.0 s—
fetchsucceeded15 s—
extractsucceeded20 s—
computesucceeded0.0 s—
judgesucceeded10 s—
aggregatesucceeded0.2 s—

pipeline-v2.3 · prompts-v2.2 · rubrics-v1 · weights-v1 · bundle 4f3252e26107 · code f3c9947

Last updated 2026-10-09 How the Index is computed