Joules · weight 30%
Energy throughput
No verified annual energy-consumption figure was found, so this category is unscored.
Entity dossier · Nº 006
Strong policy advocacy and large compute pipeline; no direct frontier capability evidence. Model synthesis · opinion
Index composition
65% measured · 35% opinion · methodΔ = change vs run N-1 (2026-10-09). Index = weighted mean of the scored categories (weights renormalized over what was scored) · coverage 40% · confidence 27% · measured share 50% of the scored weight (opinion 50%). No “overall” is asked of the model. Scores are AI-assisted (disclosures).
Every published measurement, newest first. N is the run on the leaderboard now; failed attempts are not shown. Unranked runs show no Index; Δ and the Index trend compare ranked runs only.
| Run | Published | Index | Δ | K-equiv | Method | View |
|---|---|---|---|---|---|---|
| N current | 2026-10-09 | Unranked | — | — | pipeline-v2.3 · weights-v1 · rubrics-v1 | viewing |
| N-1 | 2026-10-09 | Unranked | — | — | pipeline-v2.2 · weights-v1 · rubrics-v1 | View run N-1 |
Joules · weight 30%
No verified annual energy-consumption figure was found, so this category is unscored.
Watts of thought · weight 20%
Reported operating data-center capacity: 1.4 GW (2025) = 1,400 MW → score 7.9.
Planned / under construction: 15,000 MW (2028) — shown, not scored.
an internal OpenAI memo estimated Anthropic’s total compute capacity at 1.4 GWmeasuredai.substack.com · fetched 2026-10-09 ↗
Slope · weight 15%
Fewer than two comparable annual figures were found, so growth is unscored.
Opinion · Capability · weight 15%
No evidence on new capabilities, first-to-ship tech, or cost reductions; only infrastructure and revenue figures.
Opinion · Shipping · weight 12%
Multiple large power agreements and 1.4 GW operating capacity with near-term additions; plans for multi-GW scale but limited proof of record speed.
access to more than 300 megawatts of new capacity (over 220,000 NVIDIA GPUs) within the monthanthropic.com · fetched 2026-10-09 ↗
An up to 5 gigawatt (GW) agreement with Amazon , which includes nearly 1 GW of new capacity by the end of 2026anthropic.com · fetched 2026-10-09 ↗
A 5 GW agreement with Google and Broadcom, which will begin coming online in 2027anthropic.com · fetched 2026-10-09 ↗
an internal OpenAI memo estimated Anthropic’s total compute capacity at 1.4 GWmeasuredai.substack.com · fetched 2026-10-09 ↗
Opinion · Policy · weight 8%
Explicit calls to accelerate permitting, transmission, and executive action for energy build-out without added restrictions.
the executive branch—as this report explains—can unlock this potential without new authorities for Congress, if it chooseswww-cdn.anthropic.com · fetched 2026-10-09 ↗
to compete with China, it is critical that the U.S. take further action to address regulatory challenges that can delay energy projectsanthropic.com · fetched 2026-10-09 ↗
| Metric | Value | Period | Source |
|---|---|---|---|
| Data-center capacity (planned) | 300 MW | 2026 | anthropic.com ↗ |
| Data-center capacity (planned) | 5 GW | 2026 | anthropic.com ↗ |
| Data-center capacity (planned) | 5 GW | 2027 | anthropic.com ↗ |
| Data-center capacity (planned) | 15 GW | 2028 | measuredai.substack.com ↗ |
| Data-center capacity (operating) | 1.4 GW | 2025 | measuredai.substack.com ↗ |
| Revenue | 4.6 USD billions | 2025 | thenextweb.com ↗ |
2 other candidate links were rejected (dead, soft-404, blocked or unreadable) and are not shown.
| Stage | Status | Time | Web searches |
|---|---|---|---|
| resolve | succeeded | 0.5 s | — |
| research | succeeded | 25 s | 5 |
| edgar | skipped | 0.0 s | — |
| fetch | succeeded | 15 s | — |
| extract | succeeded | 20 s | — |
| compute | succeeded | 0.0 s | — |
| judge | succeeded | 10 s | — |
| aggregate | succeeded | 0.2 s | — |
pipeline-v2.3 · prompts-v2.2 · rubrics-v1 · weights-v1 · bundle 4f3252e26107 · code f3c9947