The leaderboard

Entity dossier · Nº 005

Anduril Industries

Aerospace and Defense Private anduril.com ↗ Costa Mesa, CA, United States

Anduril shows rapid product development and deployment speed in defense hardware; no policy data available. Model synthesis · opinion

Unranked · insufficient data
Not ranked: insufficient data: energy undisclosed and 39% of the remaining weight scored (needs 60%, including compute or growth). We publish what was verified, but an entity is ranked only with at least 60% of the weight scored, more than 40% of the scored weight measured, and confidence above 20%. Ranking rules. Missing data is never filled with a default.

Index composition

65% measured · 35% opinion · method
Energy throughput Measured 30% —   no data
Compute capacity Measured 20% —   no data
Growth gradient Measured 15% —   no data
Frontier acceleration Opinion 15% 6.0 0.0 51%
Builder velocity Opinion 12% 6.0 -1.0 69%
Permission to build Opinion 8% —   no data

Δ = change vs run N-1 (2026-11-14). Index = weighted mean of the scored categories (weights renormalized over what was scored) · coverage 27% · confidence 16% · measured share 0% of the scored weight (opinion 100%). No “overall” is asked of the model. Scores are AI-assisted (disclosures).

Run history

Every published measurement, newest first. N is the run on the leaderboard now; failed attempts are not shown. Unranked runs show no Index; Δ and the Index trend compare ranked runs only.

RunPublishedIndexΔK-equivMethodView
N current 2026-11-22 Unranked — — pipeline-v2.16 · prompts-v2.6 · rubrics-v1 · weights-v1 viewing
N-1 2026-11-14 Unranked — — pipeline-v2.16 · prompts-v2.6 · rubrics-v1 · weights-v1 View run N-1
N-2 2026-10-21 Unranked — — pipeline-v2.16 · prompts-v2.6 · rubrics-v1 · weights-v1 View run N-2
N-3 2026-10-13 Unranked — — pipeline-v2.13 · prompts-v2.5 · rubrics-v1 · weights-v1 View run N-3
N-4 2026-10-09 Unranked — — pipeline-v2.6 · prompts-v2.4 · rubrics-v1 · weights-v1 View run N-4
N-5 2026-10-09 Unranked — — pipeline-v2.2 · prompts-v2.2 · rubrics-v1 · weights-v1 View run N-5

Measured — computed in code from reported figures

Joules · weight 30%

Energy throughput

—no data

No verified annual energy-consumption figure was found, so this category is unscored.

P = annual energy (J) / seconds per year → average watts. Score = clamp(2.5 × (log₁₀P − 7), 0, 10). Kardashev-equivalent K = (log₁₀P − 6) / 10.

Watts of thought · weight 20%

Compute capacity

—no data

No verified operating data-center capacity was found, so this category is unscored.

Score = clamp(2.5 × log₁₀(MW), 0, 10).

Slope · weight 15%

Growth gradient

—no data

Fewer than two comparable annual figures were found, so growth is unscored.

Each available sub-metric's compound annual growth rate (up to 3 years) is mapped piecewise-linearly through the anchors, then combined with weights capex 50%, revenue 25%, energy 25% (renormalized over what is available).

Opinion — model-judged against written rubrics, from verified quotes only

Opinion · Capability · weight 15%

Frontier acceleration

6.0/ 10

Roadrunner developed from sketch to fieldable system in under two years, faster than traditional defense timelines [E1228].

  • Verified evidence
  • Roadrunner went from a napkin sketch to an operationally validated and fieldable solution in less than two years, which is much faster than most traditional defense contractor timelines. anduril.com · fetched 2026-11-22 ↗
Opinion Rubric · confidence 51%

Opinion · Shipping · weight 12%

Builder velocity

6.0/ 10

Menace-I shelter operational in 10 minutes; Roadrunner fielded in under two years [E1225,E1228]. Planned Arsenal-1 excluded per rules.

  • Verified evidence
  • Menace-I provides deployable edge infrastructure for any mission — transporting and sustaining high-density compute in a fully integrated shelter that can be operational in 10 minutes. anduril.com · fetched 2026-11-22 ↗
  • Roadrunner went from a napkin sketch to an operationally validated and fieldable solution in less than two years, which is much faster than most traditional defense contractor timelines. anduril.com · fetched 2026-11-22 ↗
Opinion Rubric · confidence 69%

Opinion · Policy · weight 8%

Permission to build

—insufficient

No evidence provided on permitting, energy, open source or regulation.

Opinion Rubric

Sources we fetched and verified

  1. Menace-I | Anduril anduril.com/menace-i · fetched 2026-11-22 · sha256 835f8f7c0e70 · primary
  2. Anduril Building Arsenal-1 Hyperscale Manufacturing Facility in Ohio | Anduril anduril.com/news/anduril-building-arsenal-1-hyperscale-ma... · fetched 2026-11-22 · sha256 dd2065149ee7 · primary
  3. Arsenal-1: One Year In | Anduril anduril.com/news/arsenal-1-one-year-in · fetched 2026-11-22 · sha256 b403d541f65b · primary
  4. Anduril Raises $1.5 Billion to Rebuild the Arsenal of Democracy | Anduril anduril.com:443/news/anduril-raises-usd1-5-billion-to-reb... · fetched 2026-11-22 · sha256 39d6d1515f04 · primary
  5. AI Insight Forum: National Security | Anduril anduril.com/news/ai-insight-forum-national-security · fetched 2026-11-22 · sha256 18853eea2ada · primary
  6. Anduril in 2023: A year in review | Anduril anduril.com/news/anduril-in-2023-a-year-in-review · fetched 2026-11-22 · sha256 259c768eac75 · primary
  7. AWS Names Anduril a Preferred Edge Provider for National Security and Defense | Anduril anduril.com/news/aws-names-anduril-a-preferred-edge-provi... · fetched 2026-11-22 · sha256 3191a90e2f78 · primary
  8. Modern Anti-Slavery Policy | Anduril anduril.com/modern-anti-slavery-policy · fetched 2026-11-22 · sha256 467dcc6825d8 · primary
  9. Anduril appoints Richard Drake as General Manager of Anduril UK & Europe | Anduril anduril.com/news/anduril-appoints-richard-drake-as-genera... · fetched 2026-11-22 · sha256 c4400e38c4d1 · primary
  10. Terms of service – Anduril Gear Store gear.anduril.com/policies/terms-of-service · fetched 2026-11-22 · sha256 9c288e5894f4 · primary
  11. Anduril Open to Establishing Factory in UK thedefensepost.com/2025/03/25/uk-anduril-factory/amp · fetched 2026-11-22 · sha256 abb75c71a44d
  12. Anduril Considers UK Factory As Europe Beefs up Its Military Power - Business Insider businessinsider.com/anduril-uk-factory-drones-europe-mili... · fetched 2026-11-22 · sha256 2f0ce07d51f7
Run N · 2026-11-22 02:01 PST · 54 s · 8 stages · grok-4.3
StageStatusTimeWeb searches
resolvesucceeded0.2 s—
researchsucceeded23 s5
edgarskipped0.0 s—
fetchsucceeded3.8 s—
extractsucceeded13 s—
computesucceeded0.0 s—
judgesucceeded12 s—
aggregatesucceeded0.0 s—

pipeline-v2.16 · prompts-v2.6 · rubrics-v1 · weights-v1 · bundle 4f598a1f625a · code d86a50c

Last updated 2026-11-22 How the Index is computed