← The leaderboard
Entity dossier · Nº 018
International Business Machines Corporation
IBM shows routine energy project execution and renewable targets but no frontier tech evidence in the data. Model synthesis · opinion
Decelerating
Confidence 51%
Index composition
65% measured · 35% opinion · method
Energy throughput Measured
30%
3.5
0.0
90%
Compute capacity Measured
20%
—
no data
Growth gradient Measured
15%
2.8
0.0
92%
Frontier acceleration Opinion
15%
—
no data
Builder velocity Opinion
12%
4.0
new
51%
Permission to build Opinion
8%
6.0
new
44%
Run history
Every published measurement, newest first. N is the run on the leaderboard now; failed attempts are not shown. Unranked runs show no Index; Δ and the Index trend compare ranked runs only.
Measured — computed in code from reported figures
Joules · weight 30%
Energy throughput
3.5/ 10
Reported energy consumed: 2,236,000 MWh (2024) = 2.24 TWh/yr → 255 MW average → score 3.5, K = 0.241.
- Verified evidence
In 2024, the total energy consumption by IBM’s global operations was approximately 2,236,000 MWh across all commodities, of which 83% was electricity.
ibm.com · fetched 2026-10-13 ↗
Watts of thought · weight 20%
Compute capacity
—no data
No verified operating data-center capacity was found, so this category is unscored.
Slope · weight 15%
Growth gradient
2.8/ 10
Compound annual growth: capex -7%/yr over 3y, revenue +4%/yr over 3y, energy -3%/yr over 3y → score 2.8.
- Verified evidence
- PaymentsToAcquirePropertyPlantAndEquipment = 1,346,000,000 USD for fiscal year ended 2022-12-31 (10-K, accession 0000051143-25-000015) sec.gov · fetched 2026-10-13 ↗
- PaymentsToAcquirePropertyPlantAndEquipment = 1,245,000,000 USD for fiscal year ended 2023-12-31 (10-K, accession 0000051143-26-000010) sec.gov · fetched 2026-10-13 ↗
- PaymentsToAcquirePropertyPlantAndEquipment = 1,048,000,000 USD for fiscal year ended 2024-12-31 (10-K, accession 0000051143-26-000010) sec.gov · fetched 2026-10-13 ↗
- PaymentsToAcquirePropertyPlantAndEquipment = 1,091,000,000 USD for fiscal year ended 2025-12-31 (10-K, accession 0000051143-26-000010) sec.gov · fetched 2026-10-13 ↗
- +5 more in Reported figures
Opinion — model-judged against written rubrics, from verified quotes only
Opinion · Capability · weight 15%
Frontier acceleration
—insufficient
No evidence of new capabilities, releases or cost reductions in any field.
Opinion · Shipping · weight 12%
Builder velocity
4.0/ 10
Implemented 634 energy conservation projects in 2025 [E641]; capex steady near $1.1B [E625]. Ordinary cadence.
- Verified evidence
In 2025 we implemented 634 energy conservation projects avoiding an estimated 123,000 MWh of energy consumption and 35,000 mtCO 2 e.
ibm.com · fetched 2026-10-13 ↗
Opinion · Policy · weight 8%
Permission to build
6.0/ 10
Commits to 75-90% renewable electricity procurement by 2025-2030 [E640], supporting energy build-out.
- Verified evidence
Procure 75% of the electricity IBM consumes worldwide from renewable sources by 2025, and 90% by 2030.
ibm.com · fetched 2026-10-13 ↗
Run N · 2026-10-13 08:02 PDT · 3m 41s · 8 stages · grok-4.3
pipeline-v2.13 · prompts-v2.5 · rubrics-v1 · weights-v1 · bundle 84d74e4a87a6 · code 41d8b4c