Joules · weight 30%
Energy throughput
Reported energy consumed: 12,805,833 MWh (2025) = 12.81 TWh/yr → 1.5 GW average → score 5.4, K = 0.316.
- Verified evidence
Total Energy Consumption 12,805,833 MWh
go2.digitalrealty.com · fetched 2026-10-10 ↗
Entity dossier · Nº 014
Data center operator with 3 GW operating capacity and emission reduction targets; limited evidence on frontier tech or policy advocacy. Model synthesis · opinion
1.5 GW average power · 12.81 TWh/yr energy consumed (2025).
K = (log₁₀P − 6) / 10 with P in watts. Humanity today ≈ K 0.73. Computed in code from the reported figure — source: go2.digitalrealty.com/rs/087-YZJ-646/images/Report_Digita....
Index composition
65% measured · 35% opinion · methodIndex = weighted mean of the scored categories (weights renormalized over what was scored) · coverage 80% · confidence 59% · measured share 81% of the scored weight (opinion 19%). No “overall” is asked of the model. Scores are AI-assisted (disclosures).
Every published measurement, newest first. N is the run on the leaderboard now; failed attempts are not shown. Unranked runs show no Index; Δ and the Index trend compare ranked runs only.
A trend line appears after the second published run.
| Run | Published | Index | Δ | K-equiv | Method | View |
|---|---|---|---|---|---|---|
| N current | 2026-10-10 | 5.4 | — | 0.316 | pipeline-v2.9 · weights-v1 · rubrics-v1 | viewing |
Joules · weight 30%
Reported energy consumed: 12,805,833 MWh (2025) = 12.81 TWh/yr → 1.5 GW average → score 5.4, K = 0.316.
Total Energy Consumption 12,805,833 MWhgo2.digitalrealty.com · fetched 2026-10-10 ↗
Watts of thought · weight 20%
Reported operating data-center capacity: 3 GW (2026) = 3,000 MW → score 8.7.
Planned / under construction: 9,000 MW (2026) — shown, not scored.
Global Capacity ~3 GW In-Place IT Capacityinvestor.digitalrealty.com · fetched 2026-10-10 ↗
Slope · weight 15%
Compound annual growth: revenue -29%/yr over 3y, energy +10%/yr over 1y → score 2.5. Not available: capex (confidence reduced).
Opinion · Capability · weight 15%
First-of-its-kind grid-flexible AI power management reference design [E375]; incremental infrastructure improvement for data centers.
Digital Realty announced the development of a first- of-its-kind grid-flexible power management at our new Northern Virginia facility.go2.digitalrealty.com · fetched 2026-10-10 ↗
Opinion · Shipping · weight 12%
Insufficient verified evidence for this rubric.
Opinion · Policy · weight 8%
Insufficient verified evidence for this rubric.
| Metric | Value | Period | Source |
|---|---|---|---|
| Revenue | 6,112,692,000 USD | FY2025 | sec.gov ↗ SEC XBRL |
| Revenue | 5,554,968,000 USD | FY2024 | sec.gov ↗ SEC XBRL |
| Revenue | 5,477,061,000 USD | FY2023 | sec.gov ↗ SEC XBRL |
| Revenue | 4,691,834,000 USD | FY2022 | sec.gov ↗ SEC XBRL |
| Energy consumed | 12,805,833 MWh | 2025 | go2.digitalrealty.com ↗ |
| Energy consumed | 11,860,360 MWh | 2025 | go2.digitalrealty.com ↗ |
| Energy consumed | 11,649,837 MWh | 2024 | go2.digitalrealty.com ↗ |
| Energy consumed | 8,486,552 MWh | 2024 | go2.digitalrealty.com ↗ |
| Data-center capacity (operating) | 3 GW | 2026 | investor.digitalrealty.com ↗ |
| Data-center capacity (planned) | 9 GW | 2026 | investor.digitalrealty.com ↗ |
| Data-center capacity (planned) | 1.4 GW | 2026 | investor.digitalrealty.com ↗ |
| Capital expenditure | 2,541,138 USD thousands | 2025 | investor.digitalrealty.com ↗ |
| Revenue | 1,924,040 USD thousands | Q2 2026 | investor.digitalrealty.com ↗ |
1 other candidate link was rejected (dead, soft-404, blocked or unreadable) and are not shown.
| Stage | Status | Time | Web searches |
|---|---|---|---|
| resolve | succeeded | 4.9 s | 2 |
| research | succeeded | 12 s | 3 |
| edgar | succeeded | 0.3 s | — |
| fetch | succeeded | 50 s | — |
| extract | succeeded | 16 s | — |
| compute | succeeded | 0.0 s | — |
| judge | succeeded | 10 s | — |
| aggregate | succeeded | 0.0 s | — |
pipeline-v2.9 · prompts-v2.5 · rubrics-v1 · weights-v1 · bundle f7ca9a5c4a2a · code eb7ac43