The leaderboard

Entity dossier · Nº 011

Oracle Corporation

Enterprise Software NYSE: ORCL Public oracle.com ↗ Austin, Texas, USA SEC CIK 1341439 ↗

Oracle shows rapid infrastructure scaling via GW deliveries and capex growth; frontier tech evidence absent; policy limited to internal sustainability targets. Model synthesis · opinion

Climbing Confidence 56%
Kardashev-equivalent K 0.277

588 MW average power · 5.16 TWh/yr energy consumed (FY2025).

K = (log₁₀P − 6) / 10 with P in watts. Humanity today ≈ K 0.73. Computed in code from the reported figure — source: oracle.com/a/ocom/docs/social-impact-datasheet.pdf.

Index composition

65% measured · 35% opinion · method
Energy throughput Measured 30% 4.4 0.0 90%
Compute capacity Measured 20% —   no data
Growth gradient Measured 15% 8.0 0.0 92%
Frontier acceleration Opinion 15% —   no data
Builder velocity Opinion 12% 8.0 new 85%
Permission to build Opinion 8% 6.0 new 61%

Δ = change vs run N-1 (2026-10-10). Index = weighted mean of the scored categories (weights renormalized over what was scored) · coverage 65% · confidence 56% · measured share 69% of the scored weight (opinion 31%). No “overall” is asked of the model. Scores are AI-assisted (disclosures).

Run history

Every published measurement, newest first. N is the run on the leaderboard now; failed attempts are not shown. Unranked runs show no Index; Δ and the Index trend compare ranked runs only.

RunPublishedIndexΔK-equivMethodView
N current 2026-10-13 6.1 — 0.277 pipeline-v2.13 · prompts-v2.5 · rubrics-v1 · weights-v1 viewing
N-1 2026-10-10 Unranked — 0.277 pipeline-v2.9 · prompts-v2.5 · rubrics-v1 · weights-v1 View run N-1

Measured — computed in code from reported figures

Joules · weight 30%

Energy throughput

4.4/ 10

Reported energy consumed: 5,155,385 MWh (FY2025) = 5.16 TWh/yr → 588 MW average → score 4.4, K = 0.277.

P = annual energy (J) / seconds per year → average watts. Score = clamp(2.5 × (log₁₀P − 7), 0, 10). Kardashev-equivalent K = (log₁₀P − 6) / 10. · confidence 90%

Watts of thought · weight 20%

Compute capacity

—no data

No verified operating data-center capacity was found, so this category is unscored.

Score = clamp(2.5 × log₁₀(MW), 0, 10).

Slope · weight 15%

Growth gradient

8.0/ 10

Compound annual growth: capex +86%/yr over 3y, revenue +10%/yr over 3y, energy +32%/yr over 1y → score 8.0.

  • Verified evidence
  • PaymentsToAcquirePropertyPlantAndEquipment = 8,695,000,000 USD for fiscal year ended 2023-05-31 (10-K, accession 0000950170-25-087926) sec.gov · fetched 2026-10-13 ↗
  • PaymentsToAcquirePropertyPlantAndEquipment = 6,866,000,000 USD for fiscal year ended 2024-05-31 (10-K, accession 0001193125-26-277521) sec.gov · fetched 2026-10-13 ↗
  • PaymentsToAcquirePropertyPlantAndEquipment = 21,215,000,000 USD for fiscal year ended 2025-05-31 (10-K, accession 0001193125-26-277521) sec.gov · fetched 2026-10-13 ↗
  • PaymentsToAcquirePropertyPlantAndEquipment = 55,663,000,000 USD for fiscal year ended 2026-05-31 (10-K, accession 0001193125-26-277521) sec.gov · fetched 2026-10-13 ↗
  • +5 more in Reported figures
Each available sub-metric's compound annual growth rate (up to 3 years) is mapped piecewise-linearly through the anchors, then combined with weights capex 50%, revenue 25%, energy 25% (renormalized over what is available). · confidence 92%

Opinion — model-judged against written rubrics, from verified quotes only

Opinion · Capability · weight 15%

Frontier acceleration

—insufficient

No evidence of new capabilities shipped, cost reductions, or open releases; only energy matching and financials provided.

Opinion Rubric

Opinion · Shipping · weight 12%

Builder velocity

8.0/ 10

Delivered >1.2 GW in FY26 with accelerating pace; capex ramped from $6.9B (FY24) to $55.7B (FY26) [E688][E674][E675].

  • Verified evidence
  • Q4 finalizes an impressive FY26 where we delivered >1.2GW to customers. Our pace of delivery continues to accelerate, with our FY27Q1 delivery approaching 1GW blogs.oracle.com · fetched 2026-10-13 ↗
  • PaymentsToAcquirePropertyPlantAndEquipment = 55,663,000,000 USD for fiscal year ended 2026-05-31 (10-K, accession 0001193125-26-277521) sec.gov · fetched 2026-10-13 ↗
  • PaymentsToAcquirePropertyPlantAndEquipment = 21,215,000,000 USD for fiscal year ended 2025-05-31 (10-K, accession 0001193125-26-277521) sec.gov · fetched 2026-10-13 ↗
Opinion Rubric · confidence 85%

Opinion · Policy · weight 8%

Permission to build

6.0/ 10

Public commitments to 100% carbon-free electricity for cloud and AI data centers by 2035 support energy build-out [E689][E687].

  • Verified evidence
  • We are committed to maintaining 100% carbon-free electricity for our offices and public cloud offerings. Additionally, we are setting a new goal to achieve 100% carbon-free electricity for Oracle Custom AI Data Centers by 2035 oracle.com · fetched 2026-10-13 ↗
  • In 2025, we matched 100% of our annual electricity use with renewable energy oracle.com · fetched 2026-10-13 ↗
Opinion Rubric · confidence 61%

Reported figures

MetricValuePeriodSource
Capital expenditure 55,663,000,000 USD FY2026 sec.gov ↗ SEC XBRL
Capital expenditure 21,215,000,000 USD FY2025 sec.gov ↗ SEC XBRL
Capital expenditure 6,866,000,000 USD FY2024 sec.gov ↗ SEC XBRL
Capital expenditure 8,695,000,000 USD FY2023 sec.gov ↗ SEC XBRL
Revenue 67,357,000,000 USD FY2026 sec.gov ↗ SEC XBRL
Revenue 57,399,000,000 USD FY2025 sec.gov ↗ SEC XBRL
Revenue 52,961,000,000 USD FY2024 sec.gov ↗ SEC XBRL
Revenue 49,954,000,000 USD FY2023 sec.gov ↗ SEC XBRL
Energy consumed 5,155,385 MWh FY2025 oracle.com ↗
Energy consumed 3,899,503 MWh FY2024 oracle.com ↗
Electricity consumed 4,645,576 MWh FY2025 oracle.com ↗

Sources we fetched and verified

  1. SEC XBRL company facts — ORACLE CORP data.sec.gov/api/xbrl/companyfacts/CIK0001341439.json · fetched 2026-10-13 · primary
  2. Oracle Environmental and Social Impact Datasheet oracle.com/a/ocom/docs/social-impact-datasheet.pdf · fetched 2026-10-13 · sha256 1c9719884596 · primary
  3. CDP Climate Change Questionnaire oracle.com/asean/a/ocom/docs/cdp-climate-change-questionnaire.pdf · fetched 2026-10-13 · sha256 7ebc74a40f35 · primary
  4. Navigating the labyrinth: The complexity of ESG data collection | modernfinance blogs.oracle.com/modernfinance/navigating-labyrinth-compl... · fetched 2026-10-13 · sha256 b6b76319013e · primary
  5. 10-K sec.gov/Archives/edgar/data/1341439/000119312526277521/or... · fetched 2026-10-13 · sha256 b3963b663eda · primary
  6. Planet - Environmental and Social Impact | Oracle oracle.com/social-impact/planet · fetched 2026-10-13 · sha256 08ff081ada05 · primary
  7. Oracle’s Sustainability Journey: Celebrating our progress and charting the course for responsible growth |... blogs.oracle.com/sustainability/oracles-sustainability-jo... · fetched 2026-10-13 · sha256 abc1f4ee4c50 · primary
  8. Abilene Data Centers | Oracle oracle.com/data-centers/abilene · fetched 2026-10-13 · sha256 558c9d5eab46 · primary
  9. Oracle AI Infrastructure in 2026 and Our Commitment to Local Communities oracle.com/news/announcement/blog/oracle-ai-infrastructur... · fetched 2026-10-13 · sha256 ecbb8b49854c · primary
  10. From the Q4 Earnings Call: Driving Sustainable Growth Through Durable Differentiation | The Office of the CEO blogs.oracle.com/ceo/from-the-q4-earnings-call · fetched 2026-10-13 · sha256 93682c634d40 · primary
  11. Oracle Fusion Cloud Sustainability oracle.com/a/ocom/docs/fusion-cloud-sustainability.pdf · fetched 2026-10-13 · sha256 f587ffd35ca8 · primary
  12. Oracle shares slide on $15B increase in data center spending - Ars Technica arstechnica.com/information-technology/2025/12/oracle-sha... · fetched 2026-10-13 · sha256 f5bfe30b6bf7

2 other candidate links were rejected (dead, soft-404, blocked or unreadable) and are not shown.

Run N · 2026-10-13 08:11 PDT · 1m 30s · 8 stages · grok-4.3
StageStatusTimeWeb searches
resolvesucceeded0.0 s—
researchsucceeded25 s5
edgarsucceeded0.3 s—
fetchsucceeded34 s—
extractsucceeded17 s—
computesucceeded0.0 s—
judgesucceeded13 s—
aggregatesucceeded0.0 s—

pipeline-v2.13 · prompts-v2.5 · rubrics-v1 · weights-v1 · bundle 84d74e4a87a6 · code 41d8b4c

Last updated 2026-10-13 How the Index is computed