Alphabet Inc.
Alphabet ships improved custom AI hardware and backs grid permitting reform while scaling energy procurement plans and capex. Model synthesis · opinion
Climbing
Confidence 46% · +0.1 vs N-1
Index composition
65% measured · 35% opinion · method
Energy throughput Measured
30%
6.4
+0.2
65%
Compute capacity Measured
20%
—
no data
Growth gradient Measured
15%
7.4
-0.1
88%
Frontier acceleration Opinion
15%
6.0
0.0
59%
Builder velocity Opinion
12%
—
no data
Permission to build Opinion
8%
6.0
0.0
62%
Run history
Every published measurement, newest first. N is the run on the leaderboard now; failed attempts are not shown. Unranked runs show no Index; Δ and the Index trend compare ranked runs only.
Measured — computed in code from reported figures
Joules · weight 30%
Energy throughput
6.4/ 10
Reported energy consumed: 32,727,800 MWh (2024) = 32.73 TWh/yr → 3.7 GW average → score 6.4, K = 0.357.
- Verified evidence
Total energy consumption MWh 15,500,100 18,639,900 22 ,367,100 25,910,500 32,727,800
gstatic.com · fetched 2026-10-13 ↗
Watts of thought · weight 20%
Compute capacity
—no data
No verified operating data-center capacity was found, so this category is unscored.
Slope · weight 15%
Growth gradient
7.4/ 10
Compound annual growth: capex +43%/yr over 3y, revenue +14%/yr over 2y, energy +26%/yr over 1y → score 7.4.
- Verified evidence
- PaymentsToAcquirePropertyPlantAndEquipment = 31,485,000,000 USD for fiscal year ended 2022-12-31 (10-K, accession 0001652044-25-000014) sec.gov · fetched 2026-10-13 ↗
- PaymentsToAcquirePropertyPlantAndEquipment = 32,251,000,000 USD for fiscal year ended 2023-12-31 (10-K, accession 0001652044-26-000018) sec.gov · fetched 2026-10-13 ↗
- PaymentsToAcquirePropertyPlantAndEquipment = 52,535,000,000 USD for fiscal year ended 2024-12-31 (10-K, accession 0001652044-26-000018) sec.gov · fetched 2026-10-13 ↗
- PaymentsToAcquirePropertyPlantAndEquipment = 91,447,000,000 USD for fiscal year ended 2025-12-31 (10-K, accession 0001652044-26-000018) sec.gov · fetched 2026-10-13 ↗
- +5 more in Reported figures
Opinion — model-judged against written rubrics, from verified quotes only
Opinion · Capability · weight 15%
Frontier acceleration
6.0/ 10
New TPUs achieve 2x better performance-per-watt, a material cost-per-capability gain on custom AI silicon [E565].
- Verified evidence
New TPUs deliver up to 2x better performance-per-watt 10 Our eighth-generation custom AI chips (TPU 8t, optimized for training, and TPU 8i, optimized for inference) deliver up to two times better performance-per-watt over Ironwood
sustainability.google · fetched 2026-10-13 ↗
Opinion · Shipping · weight 12%
Builder velocity
—insufficient
Evidence limited to 2025 purchase agreements (planned capacity) and rising capex totals; no verified deployment cadence or first-of-a-kind timelines.
Opinion · Policy · weight 8%
Permission to build
6.0/ 10
Explicit support for permitting reforms and advanced transmission to accelerate grid build-out for data centers [E564].
- Verified evidence
At Google, we support policy and utility measures that can unlock grid connected energy supplies for data centers, including measures that accelerate deployment of advanced transmission technologies and permitting reforms that can speed construction of new transmission lines.
web.archive.org · fetched 2026-10-13 ↗