Joules · weight 30%
Energy throughput
No verified annual energy-consumption figure was found, so this category is unscored. Reported energy storage deployed figures are recorded but are not energy the company consumes.
Entity dossier · Nº 001
Tesla ships new AI chips and operates large training clusters while advancing data-center builds; no policy evidence available. Model synthesis · opinion
Index composition
65% measured · 35% opinion · methodΔ = change vs run N-1 (2026-10-25). Index = weighted mean of the scored categories (weights renormalized over what was scored) · coverage 62% · confidence 42% · measured share 56% of the scored weight (opinion 44%). No “overall” is asked of the model. Scores are AI-assisted (disclosures).
Every published measurement, newest first. N is the run on the leaderboard now; failed attempts are not shown. Unranked runs show no Index; Δ and the Index trend compare ranked runs only.
| Run | Published | Index | Δ | K-equiv | Method | View |
|---|---|---|---|---|---|---|
| N current | 2026-11-10 | 5.3 | — | — | pipeline-v2.16 · prompts-v2.6 · rubrics-v1 · weights-v1 | viewing |
| N-1 | 2026-10-25 | Unranked | — | — | pipeline-v2.16 · prompts-v2.6 · rubrics-v1 · weights-v1 | View run N-1 |
| N-2 | 2026-10-22 | Unranked | — | — | pipeline-v2.16 · prompts-v2.6 · rubrics-v1 · weights-v1 | View run N-2 |
| N-3 | 2026-10-21 | Unranked | — | — | pipeline-v2.16 · prompts-v2.6 · rubrics-v1 · weights-v1 | View run N-3 |
| N-4 | 2026-10-13 | Unranked | — | — | pipeline-v2.15 · prompts-v2.6 · rubrics-v1 · weights-v1 | View run N-4 |
| N-5 | 2026-10-13 | Unranked | — | — | pipeline-v2.13 · prompts-v2.5 · rubrics-v1 · weights-v1 | View run N-5 |
| N-6 | 2026-10-12 | Unranked | — | — | pipeline-v2.13 · prompts-v2.5 · rubrics-v1 · weights-v1 | View run N-6 |
| N-7 | 2026-10-09 | Unranked | — | — | pipeline-v2.6 · prompts-v2.4 · rubrics-v1 · weights-v1 | View run N-7 |
| N-8 | 2026-10-09 | Unranked | — | — | pipeline-v2.4 · prompts-v2.3 · rubrics-v1 · weights-v1 | View run N-8 |
| N-9 | 2026-10-09 | Unranked | — | — | pipeline-v2.3 · prompts-v2.2 · rubrics-v1 · weights-v1 | View run N-9 |
| N-10 | 2026-10-09 | Unranked | — | — | pipeline-v2.2 · prompts-v2.2 · rubrics-v1 · weights-v1 | View run N-10 |
| N-11 | 2026-10-08 | Unranked | — | — | pipeline-v2.2 · prompts-v2.2 · rubrics-v1 · weights-v1 | View run N-11 |
| N-12 | 2026-10-08 | Unranked | — | 0.073 | pipeline-v2.1 · prompts-v2.1 · rubrics-v1 · weights-v1 | View run N-12 |
Joules · weight 30%
No verified annual energy-consumption figure was found, so this category is unscored. Reported energy storage deployed figures are recorded but are not energy the company consumes.
Watts of thought · weight 20%
Reported operating data-center capacity: 225 MW (Q3 2026) = 225 MW → score 5.9.
Planned / under construction: 400 MW (2026) — shown, not scored.
Cortex 1 and Cortex 2 drew about 225 MW in Q3 2026datacentersx.com · fetched 2026-11-10 ↗
Slope · weight 15%
Compound annual growth: capex +6%/yr over 3y, revenue +5%/yr over 3y → score 4.2. Not available: energy (confidence reduced).
Opinion · Capability · weight 15%
Develops AI6 training chip via Samsung contract and D3 orbital compute chip; runs Nvidia clusters for FSD/Optimus training [E1185][E1187][E1188]. Competitive near-SOTA hardware work.
Tesla trains FSD, Cybercab and Optimus on two Nvidia clusters at Giga Texas.datacentersx.com · fetched 2026-11-10 ↗
AI6: made by Samsung under a $16.5B contract, for cars, Optimus and data-center training.datacentersx.com · fetched 2026-11-10 ↗
D3 (Dojo 3, also called AI7): a chip for orbital compute, shown on Terafab slidesdatacentersx.com · fetched 2026-11-10 ↗
Opinion · Shipping · weight 12%
Operates two Nvidia clusters and 225-500 MW data-center capacity; launched Terafab project; Dojo shutdown shows mixed execution cadence [E1185][E1179][E1189][E1186].
Tesla trains FSD, Cybercab and Optimus on two Nvidia clusters at Giga Texas.datacentersx.com · fetched 2026-11-10 ↗
August 2025: Tesla shuts Dojo down.datacentersx.com · fetched 2026-11-10 ↗
Cortex 1 and Cortex 2 drew about 225 MW in Q3 2026datacentersx.com · fetched 2026-11-10 ↗
Terafab: a chip-fab project of Tesla and SpaceX, launched March 2026.datacentersx.com · fetched 2026-11-10 ↗
Opinion · Policy · weight 8%
No public positions or actions on permitting, energy policy or regulation in evidence.
| Metric | Value | Period | Source |
|---|---|---|---|
| Capital expenditure | 8,527,000,000 USD | FY2025 | sec.gov ↗ SEC XBRL |
| Capital expenditure | 11,342,000,000 USD | FY2024 | sec.gov ↗ SEC XBRL |
| Capital expenditure | 8,899,000,000 USD | FY2023 | sec.gov ↗ SEC XBRL |
| Capital expenditure | 7,158,000,000 USD | FY2022 | sec.gov ↗ SEC XBRL |
| Revenue | 94,827,000,000 USD | FY2025 | sec.gov ↗ SEC XBRL |
| Revenue | 97,690,000,000 USD | FY2024 | sec.gov ↗ SEC XBRL |
| Revenue | 96,773,000,000 USD | FY2023 | sec.gov ↗ SEC XBRL |
| Revenue | 81,462,000,000 USD | FY2022 | sec.gov ↗ SEC XBRL |
| Revenue | 94.83 USD billions | 2025 | sec.gov ↗ |
| Data-center capacity (operating) | 225 MW | Q3 2026 | datacentersx.com ↗ |
| Data-center capacity (planned) | 400 MW | 2026 | datacentersx.com ↗ |
| Data-center capacity (operating) | 500 MW | 2023 | aidatacenterindex.com ↗ |
| Energy storage deployed (not scored) | 31 GWh | 2024 | web.archive.org ↗ |
| Energy storage deployed (not scored) | 18 GWh | 2027 | digitalassets.tesla.com ↗ |
1 other candidate link was rejected (dead, soft-404, blocked or unreadable) and are not shown.
| Stage | Status | Time | Web searches |
|---|---|---|---|
| resolve | succeeded | 0.2 s | — |
| research | succeeded | 23 s | 7 |
| edgar | succeeded | 1.1 s | — |
| fetch | succeeded | 5m 03s | — |
| extract | succeeded | 33 s | — |
| compute | succeeded | 0.0 s | — |
| judge | succeeded | 13 s | — |
| aggregate | succeeded | 0.0 s | — |
pipeline-v2.16 · prompts-v2.6 · rubrics-v1 · weights-v1 · bundle 4f598a1f625a · code d86a50c